The principles guiding how we plan to operate
These are the commitments we’re prepared to be held to.
Where a number or detail is still being finalized through engineering or permitting, we’ve marked it; we’d rather tell you what we don’t know yet than guess.
Paying our own way
Data centers run around the clock, and that takes real power. We intend to work closely with Pacific Power and regional grid operators to plan and fund the infrastructure this project requires: new or upgraded substations and transmission capacity that can also strengthen the grid for everyone else in the county.
Independent studies of comparable projects elsewhere have found that when a developer pays its full energy infrastructure costs, those costs are not passed on to residential or business ratepayers. That’s the standard we intend to meet here, and we expect it to be verifiable through the utility rate-setting process.
- Full funding of the energy infrastructure and electric-service upgrades required to serve the site.
- Working with Pacific Power on demand-flexibility measures that support grid reliability during peak periods.
- Reporting facility energy efficiency (PUE) publicly once operational, benchmarked against industry averages.
Keeping ongoing water use low
The project is being designed to conserve water. In this region’s climate, we expect outdoor air cooling to handle the substantial majority of the year, with water-based cooling used only during the hottest stretches of summer, keeping the water drawn for cooling low.
We are still evaluating water supply options, and we’re committing to structure that supply so it doesn’t come at the expense of existing agricultural or residential water users in the valley.
- Cooling designed to conserve water, with air cooling for most of the year.
- Water sourcing evaluated specifically to avoid impact on existing users and rate payers.
- All discharge to meet or exceed local and state water-quality standards.
Designing to fit into the valley
Cooling systems produce some sound, and we’re planning for it rather than treating it as an afterthought — with site-specific acoustic modeling, mitigation built into equipment selection, and landscaped buffers (berms, tree lines, and screening) so the facility sits quietly in the landscape rather than dominating it.
Before any site is finalized, we intend to complete environmental assessments covering wetlands, waterways, protected species and habitats, flood risk, and air quality — consistent with, and where possible exceeding, applicable local, state, and federal standards.
How you’ll know if we kept our word
We intend to commission an annual, independent, publicly available audit once the project is operating, covering energy costs, water use, and the community investment commitments on this page.
We’ll also keep a dated, unfiltered record of construction activity on our Project Status page, including delays and changes, not just milestones.
Stay Informed About Project Walla Walla